Six Star Hotel, Southampton Row, London, WC1

PROJECT OVERVIEW

Metsec “POD” designs, Partitions, Dry-Lining, Limelite plastering and ceilings to an extremely high specification part of the refurbishment of the existing building into a 5 star luxury hotel.

KEY STATISTICS
  • Construction Methodology – Refurbishment over four levels
  • Value – £2,100,000
  • Project Duration – 52 weeks
  • Main Contractor – McLaren

As always, it was a pleasure to work with the Delmond team on this project

Tony Whyte, McLaren Group